Cattle Gap
Made with #3 and #4 rebar
There are 3 mats that are tied & correctly spaced for maximum strength & held in place before the concrete is poured
Poured with 4500 psi concrete with fiber mesh mixed in
Frame thickness 3 ½”
5” Openings
80” Wide
12’ long (12” tall); 6600 lbs: 42 total pieces of steel with 140 ties holding in place
16’ long (12” tall); 8600 lbs: 46 total pieces of steel with 170 ties holding in place
12’ long (20” tall); 7720 lbs: 45 total pieces of steel with 140 ties holding in place
16’ long (20” tall); 10000 lbs:49 total pieces of steel with 170 ties holding in place
There are 3 mats that are tied & correctly spaced for maximum strength & held in place before the concrete is poured
Poured with 4500 psi concrete with fiber mesh mixed in
Frame thickness 3 ½”
5” Openings
80” Wide
12’ long (12” tall); 6600 lbs: 42 total pieces of steel with 140 ties holding in place
16’ long (12” tall); 8600 lbs: 46 total pieces of steel with 170 ties holding in place
12’ long (20” tall); 7720 lbs: 45 total pieces of steel with 140 ties holding in place
16’ long (20” tall); 10000 lbs:49 total pieces of steel with 170 ties holding in place